Migrate Planner to another tenant: what carries and what cannot

Plans, buckets, tasks, checklists, labels and assignments move through Graph; creation dates and completers cannot be back-dated. Here is the full list.

By Cameron ShieldsPublished 8 September 20267 minute read

Planner is the workload most often left off a migration plan and most often asked about the week after cutover. Plans belong to Microsoft 365 groups, every team has at least one, and project teams live in them. To migrate Planner to another tenant, or between groups in the same tenant, a tool has to rebuild each plan through the Graph Planner API, because neither Microsoft's cross-tenant migration nor Migration Orchestrator moves Planner. This article lists exactly what that API lets a tool carry, what it cannot, and how to run it so a re-run never duplicates a task.

How Planner is structured, and why it matters

A plan is owned by a group, and a group can own several plans. Each plan has up to 25 category labels (category1 to category25) with their names, a set of buckets in a chosen order, and tasks. A task has a title, a bucket, a position in the bucket, assignees, a priority, start and due dates, a percent complete, applied labels, and a details object with a description, a checklist in order, and attachment references, which are URLs with an alias and a type rather than files.

Two things follow. First, the destination group has to exist before anything can be created, and if the plan belongs to a team, that team should be migrated first so the plan lands in the right place; the Teams migration guide covers that sequence. Second, every Planner update has to carry the object's current etag in an If-Match header, so a tool must read before it writes and use the representation Graph returns to chain updates, or it will spend most of its time on conflicts.

What carries

Planner objectCarriedHow
PlanYesCreated in the destination group with the source title, or an existing plan with the same title is reused
Category labelsYesAll 25 category descriptions written to the plan details
BucketsYes, in orderCreated in source order; existing same-named buckets reused on re-run
TasksYes, in board orderCreated bucket by bucket; the position inside the bucket is copied with one extra read and write per task, which can be turned off for speed
AssignmentsYes, mappedSource assignee to UPN, mapped UPN, destination user id; anything unresolved is a warning and the assignee is dropped
Priority, start date, due date, percent completeYesWritten on the task
Applied labelsYesMapped to the same category slots
Description and preview typeYesWritten to task details
ChecklistYes, in orderItems are added one at a time, each placed after the previous, because items sent together get server-chosen order hints with no guaranteed sequence
Attachment referencesYes, as referencesURLs with alias and type; a prefix rewrite maps source SharePoint links to the migrated library

Everything in that table is idempotent through a JSON state file that records every destination id as soon as Graph returns it. A crash or a cancelled run resumes where it stopped, and a second run against the same state file creates nothing new unless the source has new tasks.

What cannot be back-dated or carried

The Planner API sets createdDateTime and createdBy when an object is created, and sets completedDateTime and completedBy when a task reaches 100 percent. None of them accepts a value from the caller. So in the destination, every migrated task shows the migration date and the migration app as its creator, and every completed task shows the migration as its completer.

That is a Graph limitation, not a tool choice, and no tool can avoid it. What a tool can do is preserve the information somewhere visible. ShareShift appends a footer to each task's description of the form “Migrated from Planner: created 2024-03-01 by Jane Doe; completed 2024-03-05 by John Doe”, including only the parts that are known, and the footer can be turned off if you would rather keep descriptions clean.

Not carriedReasonMitigation
Task created date and creatorSet by Graph at creation; not writableRecorded in the description footer
Task completed date and completerSet by Graph when percent complete reaches 100; not writableRecorded in the description footer
Attachment files themselvesReferences are URLs, not blobsMigrate the SharePoint library first and rewrite the URL prefixes
Assignees who cannot be mappedNo destination userWarning per task; the task is still created
Plan-level created dateSame Graph ruleNothing to do; the plan title and contents carry
Tell plan owners about the creation and completion dates before the migration rather than after. Sorting a board by created date will put every migrated task on the same day; the footer keeps the original facts on the card.

Step by step

  1. Grant the permission. The destination app needs the Graph application permission Tasks.ReadWrite.All in addition to the Teams and SharePoint permissions; the source app needs it to read plans, buckets, tasks and details. Allow about five minutes after consent before tokens carry the role.
  2. Migrate the group or team first. A plan needs a destination group. If the team is being migrated with its channels, do that run first so the plan lands with its team.
  3. Migrate the SharePoint library that holds the attached documents, so attachment references can be rewritten to live URLs.
  4. Map users. A CSV of source to destination UPNs, or a domain rewrite such as @old.com=@new.com, drives assignees. Expect warnings for departed people.
  5. Run the plan migration with a state file. Migrate all plans in the group, or name specific plans by title or id, and optionally reuse an existing destination plan with the same title.
  6. Review warnings: unmapped assignees and dropped or unrewritten attachment references are listed per task.
  7. Re-run before cutover to pick up tasks created since; existing ones are skipped by id.
shareshift planner --source-group "Finance Team" --dest-group "Finance Team" \
  --source-tenant-id <old> --tenant-id <new> --client-id <app> --pfx ./app.pfx \
  --map-domain @old.com=@new.com \
  --rewrite-url https://old.sharepoint.com/sites/finance=https://new.sharepoint.com/sites/finance \
  --state ./shareshift-planner.json

How the tools compare on Planner

Microsoft's own cross-tenant SharePoint and OneDrive migration does not move Planner, and Migration Orchestrator explicitly excludes shared data such as Teams channels and SharePoint sites; Planner is not in its scope either. ShareGate lists Planner among the workloads on every tier, alongside SharePoint, Teams, OneDrive and file shares. ShareShift includes Planner on every plan with no workload gating, and the same Graph limits apply to any tool: nothing can back-date task creation or completion.

The practical difference between tools is therefore in the details: whether board order and checklist order are preserved, whether assignees are mapped and verified rather than dropped silently, whether attachment references are rewritten, and whether a re-run is safe. Those are the four questions to put to any vendor. The tenant to tenant guide shows where Planner sits in the overall sequence, and the pricing page has the plans and the 30-day trial. For a feature by feature view against ShareGate, see the comparison page.

Frequently asked questions

Can Planner be migrated to another tenant?

Yes, through the Graph Planner API: plans, category labels, buckets in order, tasks in board order, assignments, priority, dates, progress, descriptions, checklists and attachment references. Microsoft's native cross-tenant tools do not move Planner.

Are Planner task creation dates preserved?

No. Graph sets createdDateTime, createdBy, completedDateTime and completedBy itself and does not accept values from the caller, so migrated tasks show the migration date. ShareShift records the original dates and people in a footer on each task description.

Do Planner attachments migrate?

Attachments are URL references, not files. The references are carried and their URL prefixes can be rewritten to the migrated SharePoint library, which should be migrated first.

What permission does a Planner migration need?

The Graph application permission Tasks.ReadWrite.All on the app in each tenant, plus the destination group must already exist. If the plan belongs to a team, migrate the team first.